Plat of Survey in Illinois: Who Pays, What It Shows and Why It Arrives Too Late

The one document that looks at the actual land is allowed to arrive the day before you close. Ask for it early instead.

George Kolar

By George Kolar, ABR®, SRES®

12 min read

A wooden surveyor stake with orange flagging tape driven into grass at a property corner, with a wooden fence standing a couple of feet behind it and suburban backyards beyond.
The stake says one thing. The fence says another.
On This Page
  1. What a Plat of Survey Is, and What It Is Not
  2. Who Provides It in an Illinois Sale
  3. The One Business Day Problem
  4. What a Staked Survey Actually Shows
  5. The Four Types, and Which One You Are Getting
  6. When Illinois Requires a Survey
  7. The Title Exception the Survey Removes
  8. What to Do If the Survey Shows a Problem
  9. Who Can Sign One, and What It Costs
  10. Frequently Asked Questions
  11. Final Thoughts

The Short Answer

A plat of survey is a licensed surveyor's map of the exact boundaries of a parcel and what sits on it. In an Illinois residential sale the seller normally provides it, and under the standard contract it can legally arrive as late as one business day before closing. That timing is why fence and encroachment problems get discovered when there is almost no time left to fix them.

What This Guide Answers

  • What is a plat of survey, and what does it actually show?
  • Who pays for the survey in an Illinois home sale?
  • When does it have to be delivered, and why is that a problem?
  • What happens if the survey shows a fence or a shed over the line?
  • Do I need a survey if I am paying cash or buying a condominium?
  • What does a survey cost in Illinois?

How these numbers were gathered: George Kolar and Chicago Suburb Living have specialized in Chicago suburban real estate since 2005. The survey is the cheapest document in a transaction and the one most likely to surface a problem nobody wants to deal with on a Thursday afternoon before a Friday closing.

01What a Plat of Survey Is, and What It Is Not

A plat of survey is a drawing prepared by a land surveyor licensed in Illinois that establishes where the legal boundaries of a parcel actually run, and shows the improvements on it in relation to those lines: the house, the garage, the driveway, the patio, fences, sheds, and any visible easement features.

It is not the same thing as the plat of subdivision, which is the recorded map that created the lots in the first place. It is not an appraisal, and it says nothing about value. It is not an inspection, and it says nothing about condition. And it is not a title search, though the two documents answer questions that only make sense together.

What it does is turn an abstract legal description into a picture with dimensions. For a buyer, that is the only document in the file that answers the question: is the thing I am buying actually where I think it is?

02Who Provides It in an Illinois Sale

In a residential sale on the standard Multi-Board contract, the seller provides the plat of survey, and condominiums are the exception. The form calls for a staked boundary survey of non-condominium residential property, which means the surveyor physically marks the corners of the lot rather than only drawing them.

So a buyer in an ordinary suburban purchase is not paying for this. A buyer purchasing a condominium usually gets no survey at all, because the unit is defined by the condominium declaration and its exhibits rather than by lot lines.

Where buyers do end up paying is outside the standard contract: a new construction purchase on a builder's own contract, a for sale by owner deal on a different form, a lender requiring an updated survey when the seller's is old, or a buyer who simply wants a current one because the seller's copy is twenty years out of date and predates the deck.

03The One Business Day Problem

Here is the part worth knowing before you are in it.

Under the standard contract the survey is due no less than one business day before closing. That is the floor, not the expectation, and plenty of transactions deliver it earlier. But the floor is what you get when nobody pushes, and it is a genuinely bad deadline for a document whose entire purpose is to reveal problems.

Think about what a late survey means in practice. You discover on a Thursday that the neighbor's fence sits two feet inside the lot you are buying on Friday. Now you have a choice between closing on a parcel with a known encroachment, delaying a closing that has a moving truck and a rate lock attached to it, or negotiating a fix under time pressure with a seller who has already packed.

None of those is a good position, and all of it is avoidable by asking one question early: when will the survey be ordered, and can we have it two weeks before closing rather than one day? Surveyors in this market are generally not the bottleneck. The order date is.

If you take one thing from this article, take that. Ask for the survey date in writing at the same time you ask for the title commitment, and treat a vague answer as a problem to solve now rather than later.

04What a Staked Survey Actually Shows

A good survey answers a specific list of questions, and it is worth knowing them so you can read yours.

  • Where the lot lines run, with bearings and distances, and where the corners are physically marked.
  • Whether the house sits inside the setbacks the municipality requires. A structure built too close to a line can be a zoning problem that surfaces when somebody wants a permit.
  • Encroachments onto the property. A neighbor's fence, driveway, shed, retaining wall or tree ring sitting over the line.
  • Encroachments off the property. The reverse, and the more awkward case: your fence, your shed or your air conditioning pad sitting on the neighbor's land, or over a utility easement.
  • Easements that are visible on the ground, which is how a recorded utility easement in the title commitment becomes a real strip of yard you cannot build on.
  • Recorded building lines and lot dimensions, which matter if you intend to add a garage, a pool, a fence or an addition.

That last point is the one buyers underuse. If you have any plan to build, the survey plus the municipal setback rules tell you whether the plan is possible before you own the house rather than after.

05The Four Types, and Which One You Are Getting

TypeWhat it is forWhen you see it
Boundary surveyEstablishes and maps the legal boundaries and the improvements on themThe standard residential sale. This is the one the seller provides
ALTA/NSPS land title surveyA detailed survey built to a national standard covering boundaries, improvements, easements and title mattersCommercial transactions, and occasionally a complicated residential parcel
Topographic surveyMaps elevation contours and natural and built featuresConstruction planning, drainage and grading questions
Construction surveyPlaces new structures accurately against the approved plansDuring a build, to confirm the house lands where the permit says

If a seller hands you something labeled a "mortgage inspection" or an old survey with a date in the previous century, that is not the same document and it is fair to ask for a current staked boundary survey instead.

06When Illinois Requires a Survey

Illinois does not impose a blanket requirement that every property be surveyed, but several situations produce one anyway:

  • The standard residential contract, which obliges the seller to deliver one on non-condominium property.
  • Dividing a parcel. The Illinois Plat Act requires a survey when land is split into smaller lots.
  • New construction. Municipalities generally require a survey to confirm zoning and setback compliance before and after a build, which is one of the checks worth asking about on any new construction purchase.
  • Lender requirements. Many Illinois lenders want a current survey before funding, to protect their collateral.
  • Title company requirements. A title company will often want a recent survey before it will issue an owner's policy without the standard survey exception.
  • Creating an easement. A new easement needs a survey to describe where it actually is.
  • Boundary disputes. If two owners disagree about a line, a professional survey is the evidence that resolves it.

07The Title Exception the Survey Removes

Almost every title commitment contains an exception for matters that an accurate survey would disclose. In plain terms, the title policy is saying: we insured the ownership history, but we did not go look at the land, so if the problem is visible on the ground rather than in the record, we are not covering it.

That single exception is why the survey and the title commitment belong on the same desk at the same time. A current survey is how that exception gets removed or narrowed, which converts a category of uninsured risk into either insured coverage or a problem you knowingly priced.

So the two documents answer each other. The commitment tells you about recorded easements; the survey shows you where they physically are. The commitment excludes boundary problems; the survey finds them. Reviewing one without the other leaves half the question open.

08What to Do If the Survey Shows a Problem

Most survey findings are minor and get handled without drama. A few are not. The sequence that works:

  1. Send it to your attorney immediately, the day it arrives, and say what you are worried about. This is a legal question, not a negotiating one, until somebody tells you otherwise.
  2. Establish whether it is an encroachment or an easement. A neighbor's shed over the line is a different problem from a recorded utility easement running through the side yard. One may be removable; the other is permanent and was always part of what you were buying.
  3. Ask whether the title company will insure over it. Sometimes they will, and sometimes that is enough. It is not the same thing as fixing it, and a buyer when you sell may object to the same item.
  4. Price it or cure it. If a fence has to move or a wall has to come down, somebody pays. That is a negotiation, and it goes much better fourteen days out than one day out.
  5. Do not rely on a handshake with the neighbor. An informal agreement about a fence line does not travel with the property. If a resolution matters, it belongs in writing and often in the record.

If the finding is serious enough that you would not have bought the house knowing it, that is a conversation to have with your attorney about your rights under the contract, promptly. Time limits apply to this kind of claim, and they are not something to discover later.

09Who Can Sign One, and What It Costs

In Illinois a plat of survey must be prepared by a Professional Land Surveyor licensed by the Illinois Department of Financial and Professional Regulation. You can verify a surveyor's license on the IDFPR website, and it is a reasonable thing to check if you are ordering one yourself.

Cost in Illinois commonly runs from a few hundred dollars to around a thousand, and more for a large, irregular or heavily wooded parcel. One practitioner source puts the typical range at $300 to $1,000 or more. Against the price of a house, and against the cost of discovering a boundary problem after closing, it is the best value in the transaction.

Worth asking any surveyor you hire directly: how long have you been licensed in Illinois, are you familiar with this municipality's requirements, and what is the actual date I will have the drawing in hand.

FAQFrequently Asked Questions

Who pays for the survey when buying a house in Illinois?

In a residential sale on the standard Multi-Board contract the seller provides the plat of survey, with condominiums excepted. A buyer may end up paying when the purchase runs on a different contract, such as a builder's own form, or when a lender or title company requires a newer survey than the one the seller has.

When does the survey have to be delivered before closing?

The standard contract allows it as late as one business day before closing. That is the minimum, not the norm, and it is far too late to resolve anything the survey reveals. Ask for the survey to be ordered early and delivered at least a couple of weeks out.

Do I need a survey if I am buying a condominium?

Usually no. A condominium unit is defined by the declaration and its exhibits rather than by lot lines, and the standard contract excepts condominiums from the seller's survey obligation. What you should read instead is the declaration, the plat attached to it and the association's disclosure package.

What is the difference between a plat of survey and a plat of subdivision?

A plat of subdivision is the recorded map that originally divided land into lots and dedicated the streets and easements. A plat of survey is a current drawing of one parcel showing its boundaries and the improvements on it. The first created the lot; the second tells you what is on it now.

What happens if a neighbor's fence is on my property?

It depends on how long it has been there and what was agreed. The survey establishes the fact of the encroachment; what to do about it is a legal question for your attorney, and the answer can range from a written agreement to moving the fence. Handle it before closing if you can, because your leverage largely disappears afterwards.

Can I use the seller's old survey?

Sometimes, if nothing has changed on the ground and the lender and title company will accept it. Often not, because decks, fences, sheds, pools and additions built since the survey was drawn are exactly the things that create encroachment problems, and an old drawing shows none of them.

10Final Thoughts

A plat of survey costs a few hundred dollars, is usually somebody else's obligation, and is the only document in your file that looks at the actual land. It is also allowed to arrive the day before you close, which is a rule written for convenience rather than for buyers.

So treat it as an early item instead of a late one. Ask when it will be ordered, read it next to the title commitment, and if it shows a fence, shed or wall in the wrong place, deal with it while you still have time and leverage.

Buying in the Chicago suburbs? Read how attorney review works, what to expect from inspections and warranties, and what happens if the appraisal comes in low. Selling instead? See what it really costs to sell a home, where the survey is one of the seller's line items.

George Kolar

About the Author

George Kolar, ABR®, SRES®

Managing Broker, eXp Realty · Licensed Since 2005

The survey is the easiest thing in a transaction to leave until it is too late, because it is the seller's obligation, it is inexpensive, and nobody is anxious about it until it arrives and says something unwelcome.

What I do is ask for the order date early, in writing, and put it on the same timeline as the title commitment so the two get read together rather than a day apart. Since 2005 I have worked these suburbs specifically, which means I know which municipalities are strict about setbacks and which subdivisions have fence lines that wander. If a survey has just landed and something on it looks wrong, send it over and I will tell you whether it is ordinary or worth stopping for.

Disclaimer: This article is general information about Illinois real estate practice and is not legal advice. George Kolar is a licensed Illinois REALTOR®, not an attorney or a licensed land surveyor. Contract obligations, delivery deadlines, municipal setback rules and survey costs vary by contract version, municipality and parcel and change over time. Sources cited here were read on November 7, 2026. Have your own attorney review your contract and your survey, and engage a licensed Illinois Professional Land Surveyor for any survey work.

Keep Reading

All Articles →

Contact George Kolar, SRES